RANCHO PARK CUSTOM HOME BUILDER & GENERAL CONTRACTOR
Built With Intention. Flat Streets, Every Foot Counts.
RANCHO PARK HOMES ARE BUILT DIFFERENTLY
Heart Construction is a general contractor serving Rancho Park, specializing in custom homes, full renovations, and second-story additions on small flat lots. We work with homeowners, architects, engineers and designers through organized pre-construction, transparent budgeting and steady execution — the way you keep control of scope, schedule and cost.
Rancho Park lots reward planning.
The Baseline Mansionization Ordinance caps floor area and height for new and enlarged homes on single-family lots like yours, and LADBS verifies your existing floor area in the permit application. On a lot of 5,000–7,000 sq ft, it sets how much house you can build — and we confirm that number first.
Beyond that, LADBS plan-check queues, ADU rules that keep shifting, and close neighbors on narrow lots all shape the schedule, which is why sequencing complete submittals and site planning early matters.
We guide the process so your decisions feel informed, not reactive, and so you hear from a founder-led team every week.
From Palms Park to the Westwood/Rancho Park station, second-story additions, full remodels, detached ADUs, garage conversions and teardown-rebuilds are what we build, and we bring the same structure and discipline we apply across the Westside and every project in Los Angeles.
RECENT PROJECTS
OUR REMODELING SERVICES
At Heart Construction, we specialize in creating thoughtfully designed homes that reflect the way you live. From custom ground-up builds to full-scale renovations and refined living spaces, we guide every project with craftsmanship, clarity and care for homeowners in Santa Monica, Playa Vista, Sawtelle and beyond.
OUR CONSTRUCTION COMPANY RANCHO PARK PROCESS
PLAN
First a Strategic Visioning Session: A conversation about your goals, budget and timeline, and a frank read on what your site will allow. Complimentary.
TEAM
Second we assemble the architect, structural and geotechnical engineers, civil engineer, biologist and designers your project needs — matched to your style and site's constraints.
CALL
Third a Professional Services Agreement and a small retainer begin feasibility, permitting strategy, design coordination and line-by-line budgeting.
PERMITS
We assemble and file the complete CDP and building-permit package, coordinate Fire and Environmental Health reviews, and lock scope, finishes and schedule before groundbreaking.
CONSTRUCTION
Milestone-based build. Change orders are priced and approved in writing before work begins. You get a weekly update every week — progress, decisions needed, what's next.
CLOSEOUT
Finally Walkthrough with Final inspections, punch list, documentation and warranty handover. Payments are tied to completed milestones, never arbitrary percentages.
After you contact us, Within one business day, Asaf will call to understand your property and goals. If it's a fit, we schedule a site visit. There's no obligation and no pressure — just a clear picture of what's possible.
What to Know Before
You Build in Rancho Park
LADBS plan check sets the pace in Rancho Park. Routine permits take 2–6 months; projects that need City Planning clearance run 6–12 months. Construction for a custom home takes 10–16 months. The one lever that protects your schedule is a complete, feasibility-checked submittal, filed only once floor area, setbacks and your ADU path are confirmed, so corrections do not send you back to the queue.
What It Costs
Small, expensive lots with older homes mean extra structural, systems and floor-area work, in a market where prices run high. Custom homes typically run $550–$900+ per sq ft; whole-home renovations $375–$650+ per sq ft; detached ADUs $275,000–$500,000+; pools $120,000–$340,000+. Soft costs — design, surveys and floor-area verification, permits — are additional. You receive a line-by-line budget before construction begins.
Permits & Local Rules
Permits come through the Los Angeles Department of Building and Safety, with City Planning zoning clearance. Three rules define most Rancho Park projects: the Baseline Mansionization Ordinance, the city ADU ordinance, and LADBS plan check. The mansionization limits on floor area and height shape the design of every addition and new home. The ADU ordinance sets size and setbacks for detached units. We sequence all of this from feasibility, so design decisions are made with the constraints known.
Where We Build in Rancho Park
Westside Village, Country Club Highlands, and the flat, tree-lined streets near the Sara Berman Greenway. Westside Village, south of National Blvd, is mostly modest single-level homes, many with ADUs, while blocks nearer Westwood Blvd see newer, larger rebuilds, so floor-area and structural work differ from one block to the next. Not sure which rules apply to your parcel? A feasibility review answers that in two to four weeks.
Meet the Builders Behind Your Project
Asaf Bar-Hen — Co-Founder & Developer Asaf leads design and development from concept to completion. His background spans 15 years in hospitality design, seven years in renewable energy and energy-efficient building, and real-estate work across the U.S., Asia and Central America. He leads every first call and brings a sustainability lens to each project, from energy-efficient design to fire-resilient construction.
Jason Aizenberg — Co-Founder Jason runs the operational side of every project — permits, design meetings, scheduling, subcontractor coordination and site logistics. Clients describe him as the person who "managed everything so we could focus on our family.”
California Contractors State License Board #1146456 — Class B General Building Contractor. Verify on CSLB ↗
25+ years of combined experience across high-end residential construction in Los Angeles
Frequently Asked Questions
About Renovation in Rancho Park
Do I need a permit for an ADU?
Yes. Second stories, additions and ADUs all need a LADBS permit, with City Planning zoning clearance. The Baseline Mansionization Ordinance limits floor area and height on single-family lots, and detached ADUs follow LAMC 12.22A.33: up to 1,200 sq ft with 4-ft rear and side setbacks. Garage conversions have no size cap or setback.
How long does a permit take?
Routine LADBS plan check takes 2–6 months; projects needing City Planning clearance run 6–12 months. Construction for a custom home then takes 10–16 months. Queues are citywide, so the lever you control is a complete, feasibility-checked submittal. For smaller units, see our ADU construction timeline guide.
Cost to build a home here?
Custom homes typically run $550–$900+ per sq ft. Small lots, older-home structural work and floor-area limits push toward the upper end, and we price options early so you can weigh scope against value. Soft costs — design, surveys, permits — are additional. You receive a line-by-line budget before construction begins.
How big can I build on my lot?
The Baseline Mansionization Ordinance caps floor area and height for new and enlarged homes on single-family lots, and your existing floor area must be verified in the permit application. We run a feasibility study first, so you know your buildable envelope before design begins.
Are you licensed and insured?
Yes. Heart Construction holds California Contractors State License Board license #1146456 and is bonded and insured for large-scale residential construction, major remodels and structural work. You can verify the license on the CSLB website.
Guides for Rancho Park homeowners:
- Second Story vs Home Addition in Los Angeles: What Actually Works
- ADU Los Angeles: Is It Right for Your Property?
- Custom Home vs Remodel vs Rebuild in Los Angeles
Nearby areas we serve: Santa Monica · Playa Vista · Sawtelle · Pico-Robertson · Venice · Palms
Region: All Westside communities we serve · Everywhere we build