PLAYA DEL REY HOMES ARE BUILT DIFFERENTLY
Heart Construction is a general contractor serving Playa del Rey, specializing in custom homes, full renovations, and bluff and hillside coastal builds. We work with homeowners, architects, engineers and designers through organized pre-construction, transparent budgeting and steady execution that keeps you in control from the first feasibility review.
Building in Playa del Rey isn't simple.
Most parcels need a Coastal Development Permit or exemption from the Department of City Planning before LADBS will issue a building permit. The neighborhood has no certified Local Coastal Program, so city decisions can be appealed to the Coastal Commission, and bluff lots need a second permit.
Coastal Bluffs Specific Plan heights, the hillside grading cap and a housing review on any demolition stack on top. Sequencing matters: we file the coastal step first, with a code-compliant first set, so the appeal window is a known step, not a surprise.
We guide the process so decisions feel informed, not reactive, from the surveyed grade to the final inspection.
Near Del Rey Lagoon Park and Dockweiler State Beach, we take on bluff rebuilds, lagoon-area ADUs and garage conversions, and full remodels of older tract homes; we bring the same structure and discipline we apply across the South Bay and every project in Los Angeles.
RECENT PROJECTS
OUR REMODELING SERVICES
At Heart Construction, we specialize in creating thoughtfully designed homes that reflect the way you live. From custom ground-up builds to full-scale renovations and refined living spaces, we guide every project with craftsmanship, clarity and care for homeowners in Rancho Palos Verdes, Palos Verdes Estates, Redondo Beach and beyond.
OUR CONSTRUCTION COMPANY PLAYA DEL REY PROCESS
PLAN
First a Strategic Visioning Session: A conversation about your goals, budget and timeline, and a frank read on what your site will allow. Complimentary.
TEAM
Second we assemble the architect, structural and geotechnical engineers, civil engineer, biologist and designers your project needs — matched to your style and site's constraints.
CALL
Third a Professional Services Agreement and a small retainer begin feasibility, permitting strategy, design coordination and line-by-line budgeting.
PERMITS
We assemble and file the complete CDP and building-permit package, coordinate Fire and Environmental Health reviews, and lock scope, finishes and schedule before groundbreaking.
CONSTRUCTION
Milestone-based build. Change orders are priced and approved in writing before work begins. You get a weekly update every week — progress, decisions needed, what's next.
CLOSEOUT
Finally Walkthrough with Final inspections, punch list, documentation and warranty handover. Payments are tied to completed milestones, never arbitrary percentages.
After you contact us, Within one business day, Asaf will call to understand your property and goals. If it's a fit, we schedule a site visit. There's no obligation and no pressure — just a clear picture of what's possible.
What to Know Before
You Build in Playa del Rey
The Coastal Development Permit and its appeal period set the pace in Playa del Rey, ahead of plan check at LADBS. Routine permitting runs 6–12 months; sites that draw a Coastal Commission appeal or sit in dual permit jurisdiction run 12–36 months. Construction of a custom home takes 10–18 months. The lever that protects the schedule is filing the coastal permit before plan check with a code-compliant first set.
What It Costs
Costs sit high because bluff foundations, dual coastal permitting, and height-driven multi-level designs on small dune lots add engineering and review time. Custom homes typically run $650–$1,000+ per sq ft; whole-home renovations $450–$750+ per sq ft; detached ADUs $300,000–$600,000+; pools $150,000–$400,000+. Soft costs — design, geotechnical, methane and survey studies, permits — are additional. You receive a line-by-line budget before construction begins.
Permits & Local Rules
LADBS issues the building permit, but only after City Planning clears the Coastal Development Permit. Bluff-top and shoreline lots need a second permit from the Coastal Commission under dual permit jurisdiction. The Coastal Bluffs Specific Plan sets heights on the Bluffs, and the Baseline Hillside Ordinance limits floor area and grading on slopes, so size limits shape the design. We check all of these at feasibility, not in plan check, so every design decision is made with the constraints known.
Where We Build in Playa del Rey
Manitoba West, Seagate Village, Palisades del Rey, Surfridge, Del Rey Hills, The Bluffs, Playa del Rey Beach — bluff, hillside and lagoon-side ground above Dockweiler State Beach. The Bluffs bring specific-plan heights, dual permits and geotechnical work, while Playa del Rey Beach is flat, measured against the lagoon-area height benchmark and cleared for methane and liquefaction. Not sure which rules apply to your parcel? A feasibility review answers that in two to four weeks.
Meet the Builders Behind Your Project
Asaf Bar-Hen — Co-Founder & Developer Asaf leads design and development from concept to completion. His background spans 15 years in hospitality design, seven years in renewable energy and energy-efficient building, and real-estate work across the U.S., Asia and Central America. He leads every first call and brings a sustainability lens to each project, from energy-efficient design to fire-resilient construction.
Jason Aizenberg — Co-Founder Jason runs the operational side of every project — permits, design meetings, scheduling, subcontractor coordination and site logistics. Clients describe him as the person who "managed everything so we could focus on our family.”
California Contractors State License Board #1146456 — Class B General Building Contractor. Verify on CSLB ↗
25+ years of combined experience across high-end residential construction in Los Angeles
Frequently Asked Questions
About Renovation in Playa del Rey
Do I need a coastal permit?
For most parcels, yes. Any parcel flagged Coastal Zone needs a Coastal Development Permit or exemption from City Planning before LADBS issues a permit, including additions, ADUs and exterior changes. With no certified Local Coastal Program, city permits can be appealed to the Coastal Commission, though coastal ADUs are now barred from appeal.
How long does coastal review take?
Routine permitting here runs 6–12 months. Sites with a Coastal Commission appeal or dual permit jurisdiction can run 12–36 months. We file the coastal permit before LADBS plan check with a code-compliant first set and build the appeal window into your schedule, so it is a known step.
Cost to build a home here?
Custom homes typically run $650–$1,000+ per sq ft. Bluff foundations, multi-level designs and dual coastal permitting push toward the upper end. Soft costs are additional. You receive a line-by-line budget before construction begins. For the wider picture, see our Los Angeles custom home cost guide.
What do hillside lots require?
Hillside R1 lots fall under the Baseline Hillside Ordinance: slope-band floor-area limits, hillside setbacks and a 1,000-cubic-yard by-right grading cap. On the Bluffs, the Coastal Bluffs Specific Plan caps height at 36 feet in Subarea 1 and 45 feet in Subarea 3, measured from the lower of natural or finished grade.
Are you licensed and insured?
Yes. Heart Construction holds California Contractors State License Board license #1146456 and is bonded and insured for large-scale residential construction, major remodels and structural work. You can verify the license on the CSLB website.
Guides for Playa del Rey homeowners:
- ADU Los Angeles: Is It Right for Your Property?
- Custom Home vs Remodel vs Rebuild in Los Angeles
- Custom Home Build Timeline Los Angeles
Nearby areas we serve: Rancho Palos Verdes · Palos Verdes Estates · Redondo Beach · Manhattan Beach · Rolling Hills · Lomita
Region: All South Bay communities we serve · Everywhere we build