ELIZABETH LAKE CUSTOM HOME BUILDER & GENERAL CONTRACTOR
Built With Intention. Foothills Built Fire-Ready.
ELIZABETH LAKE HOMES ARE BUILT DIFFERENTLY
Heart Construction is a general contractor serving Elizabeth Lake, specializing in custom homes, full renovations, and fire-hardened rebuilds on Sierra Pelona foothill lots. We work with homeowners, architects, engineers and designers through organized pre-construction, transparent budgeting and steady execution, so you stay in control of every decision.
Building in Elizabeth Lake isn't simple.
Nearly all of the community sits in a Very High Fire Hazard Severity Zone. LA County Public Works handles plan check, and the LA County Fire Department reviews every new home, addition and ADU alongside Public Health and Parks and Recreation. We plan for that review first, so it never arrives as a surprise.
Rural community standards add ridgeline and lighting rules, septic and well review sit on top, and the San Andreas Fault and flood zones run along Elizabeth Lake Road. Sequencing matters because each of these can change where the house sits and what it costs.
We guide the process so every decision feels informed, not reactive — and you know the limits of your lot before drawings begin.
From fire rebuilds and custom homes on hillside lots to full remodels with ADUs, we bring the same structure and discipline we apply across the Northwest County and every project in Los Angeles.
RECENT PROJECTS
OUR REMODELING SERVICES
At Heart Construction, we specialize in creating thoughtfully designed homes that reflect the way you live. From custom ground-up builds to full-scale renovations and refined living spaces, we guide every project with craftsmanship, clarity and care for homeowners in Green Valley, Castaic, Hasley Canyon and beyond.
OUR CONSTRUCTION COMPANY ELIZABETH LAKE PROCESS
PLAN
First a Strategic Visioning Session: A conversation about your goals, budget and timeline, and a frank read on what your site will allow. Complimentary.
TEAM
Second we assemble the architect, structural and geotechnical engineers, civil engineer, biologist and designers your project needs — matched to your style and site's constraints.
CALL
Third a Professional Services Agreement and a small retainer begin feasibility, permitting strategy, design coordination and line-by-line budgeting.
PERMITS
We assemble and file the complete CDP and building-permit package, coordinate Fire and Environmental Health reviews, and lock scope, finishes and schedule before groundbreaking.
CONSTRUCTION
Milestone-based build. Change orders are priced and approved in writing before work begins. You get a weekly update every week — progress, decisions needed, what's next.
CLOSEOUT
Finally Walkthrough with Final inspections, punch list, documentation and warranty handover. Payments are tied to completed milestones, never arbitrary percentages.
After you contact us, Within one business day, Asaf will call to understand your property and goals. If it's a fit, we schedule a site visit. There's no obligation and no pressure — just a clear picture of what's possible.
What to Know Before
You Build in Elizabeth Lake
Multi-agency County review sets the pace at Elizabeth Lake. LA County Public Works runs plan check, and routine permits take 3–6 months. Hillside, fire-zone or septic review pushes that to 6–12 months. A custom home then takes 10–16 months to build. The lever that protects your schedule most: we submit septic, fire and planning items together instead of one after another, so no agency waits on another.
What It Costs
Costs here reflect remote-site logistics, fire-hardening, septic and well systems and hillside grading, set against modest home values. Custom homes typically run $500–$750+ per sq ft; whole-home renovations $325–$600+ per sq ft; detached ADUs $250,000–$450,000+; pools $120,000–$300,000+. Soft costs — design, geotechnical, septic and soils studies, permits — are additional. You receive a line-by-line budget before construction begins.
Permits, Rules & Fire Codes
LA County Public Works issues permits, with Regional Planning handling zoning. Four reviews define this area: the Elizabeth Lake and Lake Hughes community standards district, County Fire review in the Very High Fire Hazard Severity Zone, hillside grading review, and septic system approval. Fire-zone construction standards and residential sprinklers are our base specification, not upgrades. We sequence all of it from feasibility, so design decisions are made with the constraints known.
Where We Build in Elizabeth Lake
We build across Andrade Corner, Ranch Club, Kiptree Drive, Montello Drive and the surrounding Sierra Pelona foothills. Ranch Club's golf-ranch properties differ from the residential lake streets of Kiptree Drive and Montello Drive, where slope, lot size and nearby fault and flood zones decide what can be built, so we confirm them before quoting. Not sure which rules apply to your parcel? A feasibility review answers that in two to four weeks.
Meet the Builders Behind Your Project
Asaf Bar-Hen — Co-Founder & Developer Asaf leads design and development from concept to completion. His background spans 15 years in hospitality design, seven years in renewable energy and energy-efficient building, and real-estate work across the U.S., Asia and Central America. He leads every first call and brings a sustainability lens to each project, from energy-efficient design to fire-resilient construction.
Jason Aizenberg — Co-Founder Jason runs the operational side of every project — permits, design meetings, scheduling, subcontractor coordination and site logistics. Clients describe him as the person who "managed everything so we could focus on our family.”
California Contractors State License Board #1146456 — Class B General Building Contractor. Verify on CSLB ↗
25+ years of combined experience across high-end residential construction in Los Angeles
Frequently Asked Questions
About Renovation in Elizabeth Lake
Who issues permits here?
LA County Public Works, Building and Safety, issues permits, with LA County Regional Planning handling zoning. Plan check runs alongside County Fire review, and the Elizabeth Lake and Lake Hughes Community Standards District in County Code Chapter 22.322 applies to new homes, additions and street-visible changes. We submit these reviews together.
How long to build in a fire zone?
Routine permits take 3–6 months; hillside, fire-zone or septic review can stretch that to 6–12 months, then construction takes 10–16 months. The County cites 18–24 months for Lake Fire rebuilds overall. Where your home qualifies for the like-for-like rebuild track, we use it, and we send weekly updates.
Cost to build a custom home?
Custom homes typically run $500–$750+ per sq ft. Hillside grading, fire-hardening, and septic and well systems push toward the upper end, and remote-site logistics add to it. Soft costs are additional. You receive a line-by-line budget before construction begins. Our cost guide shows how budgets break down.
Do I need septic or well approval?
Yes. Wells and septic need County review, and a rebuild that differs from the original footprint needs soil testing and a new septic design. Nearly all of the community is in a Very High Fire Hazard Severity Zone, so fire-hardened construction and County Fire plan review apply. We scope septic and soils before design.
Are you licensed and insured?
Yes. Heart Construction holds California Contractors State License Board license #1146456 and is bonded and insured for large-scale residential construction, major remodels and structural work. You can verify the license on the CSLB website.
Guides for Elizabeth Lake homeowners:
- Custom Home Build Timeline Los Angeles
- Custom Home vs Remodel vs Rebuild in Los Angeles
- ADU Los Angeles: Is It Right for Your Property?
Nearby areas we serve: Green Valley · Castaic · Hasley Canyon · Agua Dulce · Lake Hughes · Val Verde
Region: All Northwest County communities we serve · Everywhere we build