LITTLEROCK CUSTOM HOME BUILDER & GENERAL CONTRACTOR
Built With Intention. Open Land, Room To Grow.
LITTLEROCK HOMES ARE BUILT DIFFERENTLY
Heart Construction is a general contractor serving Littlerock, specializing in custom homes, full renovations, and rural acreage builds with well and septic. We work with homeowners, architects, engineers and designers through organized pre-construction, transparent budgeting and steady execution, so nothing about your land surprises you halfway through.
In Littlerock, the County sets the rules.
Most lots here are rural, so water and septic come first. Littlerock and Sun Village share a County Community Standards District that preserves low-density character, and Regional Planning must approve before Public Health clears a well or septic system. LA County Public Works then issues the building permit.
Rural outdoor lighting rules apply to exterior fixtures, and new homes must infiltrate stormwater onsite. Stacked approvals can overwhelm owners, so we front-load feasibility and sequence submittals before design begins.
We walk your parcel first, check zoning, legal lot, water, septic and access, and give you a written roadmap so decisions feel informed, not reactive.
Around Everett Martin Park and the Littlerock Post Office, we build new custom homes, ADUs and second units, remodels and outdoor living — and we bring the same structure and discipline we apply across the Antelope Valley and every project in Los Angeles.
RECENT PROJECTS
OUR REMODELING SERVICES
At Heart Construction, we specialize in creating thoughtfully designed homes that reflect the way you live. From custom ground-up builds to full-scale renovations and refined living spaces, we guide every project with craftsmanship, clarity and care for homeowners in Northeast Antelope Valley, Leona Valley, Northwest Antelope Valley and beyond.
OUR CONSTRUCTION COMPANY LITTLEROCK PROCESS
PLAN
First a Strategic Visioning Session: A conversation about your goals, budget and timeline, and a frank read on what your site will allow. Complimentary.
TEAM
Second we assemble the architect, structural and geotechnical engineers, civil engineer, biologist and designers your project needs — matched to your style and site's constraints.
CALL
Third a Professional Services Agreement and a small retainer begin feasibility, permitting strategy, design coordination and line-by-line budgeting.
PERMITS
We assemble and file the complete CDP and building-permit package, coordinate Fire and Environmental Health reviews, and lock scope, finishes and schedule before groundbreaking.
CONSTRUCTION
Milestone-based build. Change orders are priced and approved in writing before work begins. You get a weekly update every week — progress, decisions needed, what's next.
CLOSEOUT
Finally Walkthrough with Final inspections, punch list, documentation and warranty handover. Payments are tied to completed milestones, never arbitrary percentages.
After you contact us, Within one business day, Asaf will call to understand your property and goals. If it's a fit, we schedule a site visit. There's no obligation and no pressure — just a clear picture of what's possible.
What to Know Before
You Build in Littlerock
Multi-agency sign-off sets the pace in Littlerock. Plan check and Regional Planning clearances through LA County Public Works typically take 3–6 months for routine projects, and 6–12 months when a well, septic system or added approvals are involved. Construction of a custom home runs 10–16 months. The lever that protects your schedule most is front-loading feasibility and well and septic approvals before design starts.
What It Costs
Costs here reflect rural site work — wells, septic, grading, long utility runs and remote access — on top of the building itself. Custom homes typically run $500–$750+ per sq ft; whole-home renovations $325–$600+ per sq ft; detached ADUs $250,000–$450,000+; pools $120,000–$300,000+. Soft costs — design, well and septic studies, permits — are additional. You receive a line-by-line budget before construction begins.
Permits & Local Rules
LA County Public Works issues the building permit after Regional Planning zoning clearance. Four reviews define Littlerock: the Southeast Antelope Valley Community Standards District, rural land zoning that caps density and governs setbacks and height, Public Health review of wells and septic, and Rural Outdoor Lighting rules. We act as your single point of coordination, sequencing these from feasibility so design decisions are made with the constraints known.
Where We Build in Littlerock
East Littlerock, spread across flat acreage and hillside terrain, where parcels run large and open. Many of those larger parcels pair a private well with a septic system, while the denser Sun Village and the Pearblossom Highway town center differ in sewer, lot size and access. Not sure which rules apply to your parcel? A feasibility review answers that in two to four weeks.
Meet the Builders Behind Your Project
Asaf Bar-Hen — Co-Founder & Developer Asaf leads design and development from concept to completion. His background spans 15 years in hospitality design, seven years in renewable energy and energy-efficient building, and real-estate work across the U.S., Asia and Central America. He leads every first call and brings a sustainability lens to each project, from energy-efficient design to fire-resilient construction.
Jason Aizenberg — Co-Founder Jason runs the operational side of every project — permits, design meetings, scheduling, subcontractor coordination and site logistics. Clients describe him as the person who "managed everything so we could focus on our family.”
California Contractors State License Board #1146456 — Class B General Building Contractor. Verify on CSLB ↗
25+ years of combined experience across high-end residential construction in Los Angeles
Frequently Asked Questions
About Renovation in Littlerock
Who issues permits in Littlerock?
LA County Public Works, Building and Safety Division, issues building permits through its Antelope Valley office in Lancaster. Regional Planning zoning clearance comes first, and Regional Planning approval is required before Public Health will clear a septic or well application. Fire and water approvals may also be needed before the permit is issued.
How long to permit and build?
Routine plan check and Regional Planning clearances take 3–6 months, while more complex projects, such as those pairing a well and septic system with added reviews, take 6–12 months. Construction of a custom home then runs 10–16 months. Starting well and septic approvals before design is the best way to protect your schedule.
Cost to build in Littlerock?
Custom homes typically run $500–$750+ per sq ft. Rural site work such as wells, septic, grading and long utility runs pushes costs toward the upper end. Soft costs are additional. You receive a line-by-line budget before construction begins. Our custom home cost guide shows how the numbers build up.
Can I add an ADU in Littlerock?
Often, yes, but we confirm first. Rural land designations in the Antelope Valley Area Plan cap density, for example one unit per gross acre for RL1, per 2 acres for RL2 and per 5 acres for RL5, while zoning such as A-1 and A-2 governs setbacks and height. We check your parcel's designation and well and septic capacity before design.
Are you licensed and insured?
Yes. Heart Construction holds California Contractors State License Board license #1146456 and is bonded and insured for large-scale residential construction, major remodels and structural work. You can verify the license on the CSLB website.
Guides for Littlerock homeowners:
- ADU Los Angeles: Is It Right for Your Property?
- Custom Home vs Remodel vs Rebuild in Los Angeles
- Multi-Generational Home Solutions Los Angeles
Nearby areas we serve: Northeast Antelope Valley · Leona Valley · Northwest Antelope Valley · Lancaster · Northwest Palmdale · Lake Los Angeles
Region: All Antelope Valley communities we serve · Everywhere we build