CANOGA PARK CUSTOM HOME BUILDER & GENERAL CONTRACTOR
Built With Intention. Room Across Flat Valley Lots.CANOGA PARK HOMES ARE BUILT DIFFERENTLY
Heart Construction is a general contractor serving Canoga Park, specializing in custom homes, full renovations, and ADUs on flat Valley lots. We work alongside homeowners, architects, engineers and designers, and a founder leads your first call. We bring organized pre-construction, transparent budgeting and steady execution to every project.
Building in Canoga Park rewards planning.
Every project starts with LADBS plan check, and the Baseline Mansionization Ordinance sets the size and bulk of new homes and large additions. Many owners worry plan check will stall a project for months, so our first step is a feasibility review of your parcel profile before anything is drawn.
Warner Center plan boundaries near Topanga, Victory and Vanowen, ADU setbacks and utility separation, and the condition of older post-war houses all add layers. Sequencing them early keeps the budget and schedule honest.
We guide the process so every decision feels informed, not reactive, with weekly updates and a line-by-line budget.
Near Lanark Park and Westfield Topanga, we build ADUs and garage conversions, full remodels and additions, and custom rebuilds or second stories. We bring the same structure and discipline we apply across the San Fernando Valley and every project in Los Angeles.
RECENT PROJECTS
OUR REMODELING SERVICES
At Heart Construction, we specialize in creating thoughtfully designed homes that reflect the way you live. From custom ground-up builds to full-scale renovations and refined living spaces, we guide every project with craftsmanship, clarity and care for homeowners in Chatsworth, Burbank, Encino and beyond.
OUR CONSTRUCTION COMPANY CANOGA PARK PROCESS
PLAN
First a Strategic Visioning Session: A conversation about your goals, budget and timeline, and a frank read on what your site will allow. Complimentary.
TEAM
Second we assemble the architect, structural and geotechnical engineers, civil engineer, biologist and designers your project needs — matched to your style and site's constraints.
CALL
Third a Professional Services Agreement and a small retainer begin feasibility, permitting strategy, design coordination and line-by-line budgeting.
PERMITS
We assemble and file the complete CDP and building-permit package, coordinate Fire and Environmental Health reviews, and lock scope, finishes and schedule before groundbreaking.
CONSTRUCTION
Milestone-based build. Change orders are priced and approved in writing before work begins. You get a weekly update every week — progress, decisions needed, what's next.
CLOSEOUT
Finally Walkthrough with Final inspections, punch list, documentation and warranty handover. Payments are tied to completed milestones, never arbitrary percentages.
After you contact us, Within one business day, Asaf will call to understand your property and goals. If it's a fit, we schedule a site visit. There's no obligation and no pressure — just a clear picture of what's possible.
What to Know Before
You Build in Canoga Park
Plan check at the Los Angeles Department of Building and Safety sets the pace in Canoga Park. Routine permits take 2–6 months; projects that need Planning clearances, such as lots near Warner Center, run 6–12 months. Construction of a custom home takes 10–16 months. The lever that most protects your schedule is a feasibility review and a complete submittal up front, so plan check does not bounce back with corrections.
What It Costs
Costs here reflect older, smaller post-war homes that need system upgrades, plus utility and structural work for ADUs on flat lots. Custom homes typically run $500–$850+ per sq ft; whole-home renovations $350–$650+ per sq ft; detached ADUs $250,000–$500,000+; pools $120,000–$340,000+. Soft costs — design, surveys, utility and structural studies, permits — are additional. You receive a line-by-line budget before construction begins.
Permits & Local Rules
LADBS approves code-compliant ADUs ministerially, with no City Planning hearing and a state clock on the review once your application is complete. The Baseline Mansionization Ordinance limits the size and bulk of new homes and large additions, which shapes design from the first sketch. Lots near Warner Center fall under its specific plan and need City Planning clearance. We check your parcel profile before design, so decisions are made with the constraints known.
Where We Build in Canoga Park
The Lakes, Owensmouth, Sun Ray Estates, Canoga Gardens, Canoga Ranchos, Triumph Estates and Sunkist Gardens, across flat Valley lots near Parthenia Park. Owensmouth is the neighborhood's older core, so what sits behind the walls varies house to house more than in tract areas like Sun Ray Estates or Triumph Estates — we verify it parcel by parcel. Not sure which rules apply to your parcel? A feasibility review answers that in two to four weeks.
Meet the Builders Behind Your Project
Asaf Bar-Hen — Co-Founder & Developer Asaf leads design and development from concept to completion. His background spans 15 years in hospitality design, seven years in renewable energy and energy-efficient building, and real-estate work across the U.S., Asia and Central America. He leads every first call and brings a sustainability lens to each project, from energy-efficient design to fire-resilient construction.
Jason Aizenberg — Co-Founder Jason runs the operational side of every project — permits, design meetings, scheduling, subcontractor coordination and site logistics. Clients describe him as the person who "managed everything so we could focus on our family.”
California Contractors State License Board #1146456 — Class B General Building Contractor. Verify on CSLB ↗
25+ years of combined experience across high-end residential construction in Los Angeles
Frequently Asked Questions
About Renovation in Canoga Park
Do ADUs need an LADBS permit?
Yes. Detached and garage-conversion ADUs are approved ministerially through LADBS under LAMC 12.22 A.33, with no City Planning hearing for a code-compliant unit, and the city must act within 60 days of a complete application. Garage conversions also need LAFD hydrant and access approval and a bracing check.
How long does an ADU take?
Plan check usually takes 2–6 months, or 6–12 months when Planning clearances apply, and construction follows, sized to your scope. A complete submittal and early utility decisions save the most time. Our ADU construction timeline guide walks through each phase.
Cost to build a home here?
Custom homes typically run $500–$850+ per sq ft. Older lots needing utility separation, panel upgrades or structural work push toward the upper end. Soft costs — design, surveys, permits — are additional. You receive a line-by-line budget before construction begins.
Can I use SB 9 or build an ADU?
Often yes. Detached ADUs are generally allowed up to 1,200 sq ft with 4-ft side and rear setbacks, and junior ADUs are capped at 500 sq ft inside the existing home. The Baseline Mansionization Ordinance limits the bulk of new homes and additions. We check SB 9 eligibility and your parcel profile first.
Are you licensed and insured?
Yes. Heart Construction holds California Contractors State License Board license #1146456 and is bonded and insured for large-scale residential construction, major remodels and structural work. You can verify the license on the CSLB website.
Guides for Canoga Park homeowners:
- ADU Cost Los Angeles
- Second Story vs Home Addition in Los Angeles: What Actually Works
- Custom Home vs Remodel vs Rebuild in Los Angeles