SOUTH WHITTIER CUSTOM HOME BUILDER & GENERAL CONTRACTOR
Built With Intention. Flat Lots, Family Homes.
SOUTH WHITTIER HOMES ARE BUILT DIFFERENTLY
Heart Construction is a general contractor serving South Whittier, specializing in custom homes, full renovations, and ADUs built for flat, family-sized lots. We work with homeowners, architects, engineers and designers alongside you, through organized pre-construction, transparent budgeting and steady execution from first call to closeout.
South Whittier is County-permitted, not City-permitted.
Because South Whittier is unincorporated, LA County Public Works issues your building permit, and applications and inspections run through the EPIC-LA portal. ADUs and new units face a two-step review: Regional Planning zoning review first, then Public Works Building and Safety plan check.
ADU and zoning rules keep changing, the 1950s homes are small on modest lots, and agency fees and utility sign-offs add steps. We check the current rules and your parcel's zoning before design, so sequencing protects your schedule.
We guide the process so every decision feels informed, not reactive, and one accountable founder-led team answers your questions.
From ADUs and garage conversions to whole-home remodels, additions, kitchens and bathrooms near Adventure Park and Amelia Mayberry Park, we bring the same structure and discipline we apply across Southeast LA and every project in Los Angeles.
RECENT PROJECTS
OUR REMODELING SERVICES
At Heart Construction, we specialize in creating thoughtfully designed homes that reflect the way you live. From custom ground-up builds to full-scale renovations and refined living spaces, we guide every project with craftsmanship, clarity and care for homeowners in Walnut Park, South Gate, West Compton and beyond.
OUR CONSTRUCTION COMPANY SOUTH WHITTIER PROCESS
PLAN
First a Strategic Visioning Session: A conversation about your goals, budget and timeline, and a frank read on what your site will allow. Complimentary.
TEAM
Second we assemble the architect, structural and geotechnical engineers, civil engineer, biologist and designers your project needs — matched to your style and site's constraints.
CALL
Third a Professional Services Agreement and a small retainer begin feasibility, permitting strategy, design coordination and line-by-line budgeting.
PERMITS
We assemble and file the complete CDP and building-permit package, coordinate Fire and Environmental Health reviews, and lock scope, finishes and schedule before groundbreaking.
CONSTRUCTION
Milestone-based build. Change orders are priced and approved in writing before work begins. You get a weekly update every week — progress, decisions needed, what's next.
CLOSEOUT
Finally Walkthrough with Final inspections, punch list, documentation and warranty handover. Payments are tied to completed milestones, never arbitrary percentages.
After you contact us, Within one business day, Asaf will call to understand your property and goals. If it's a fit, we schedule a site visit. There's no obligation and no pressure — just a clear picture of what's possible.
What to Know Before
You Build in South Whittier
County plan check and agency sign-offs set the pace here, and LA County Public Works is the permit authority. Routine permits take 3–6 months; projects needing Regional Planning clearances, such as ADUs and new units, run 6–12 months. Construction of a custom home takes 10–16 months. The lever that protects your schedule most is a complete first submittal, which means fewer correction cycles.
What It Costs
Costs here reflect 1950s systems, agency and utility fees, and the work of tying new space into an existing home. Custom homes typically run $500–$750+ per sq ft; whole-home renovations $325–$600+ per sq ft; detached ADUs $250,000–$450,000+; pools $120,000–$300,000+. Soft costs — design, surveys and utility studies, permits — are additional. You receive a line-by-line budget before construction begins.
Permits & Local Rules
LA County Public Works issues your building permit through the EPIC-LA portal, and ADUs start with Regional Planning zoning review. The County's 2025 ADU ordinance sets today's ADU rules, and a 2026 amendment is still in draft, so we design to what is in effect. The 2023 Gateway rezoning changed zoning on some parcels, so we confirm your zone first. We sequence all of this from feasibility, so design decisions are made with the constraints known.
Where We Build in South Whittier
We build in Carmenita, Leffingwell, Colima, Orchard Dale, Lake Marie and the older ranch homes by Candlewood Country Club. An interior tract in Orchard Dale or Lake Marie usually sits in a plain residential tract, while parcels along the Leffingwell and Colima corridors may carry different zoning and land use after the 2023 rezoning, so we check each one. Not sure which rules apply to your parcel? A feasibility review answers that in two to four weeks.
Meet the Builders Behind Your Project
Asaf Bar-Hen — Co-Founder & Developer Asaf leads design and development from concept to completion. His background spans 15 years in hospitality design, seven years in renewable energy and energy-efficient building, and real-estate work across the U.S., Asia and Central America. He leads every first call and brings a sustainability lens to each project, from energy-efficient design to fire-resilient construction.
Jason Aizenberg — Co-Founder Jason runs the operational side of every project — permits, design meetings, scheduling, subcontractor coordination and site logistics. Clients describe him as the person who "managed everything so we could focus on our family.”
California Contractors State License Board #1146456 — Class B General Building Contractor. Verify on CSLB ↗
25+ years of combined experience across high-end residential construction in Los Angeles
Frequently Asked Questions
About Renovation in South Whittier
Do I need County permits?
Yes. South Whittier is unincorporated, so LA County Public Works issues your building permit through the EPIC-LA portal, not the City of Whittier. ADUs and new units start with Regional Planning zoning review, then go to Building and Safety plan check. We sequence both submittals for you.
How long does an ADU permit take?
Routine County permits take 3–6 months. Projects needing Regional Planning clearances, such as ADUs and new units, take 6–12 months. Utility and agency sign-offs, like the water Will Serve letter and sewer fees, add steps, so we submit complete plan sets. See our ADU construction timeline guide.
Cost to build a home here?
Custom homes typically run $500–$750+ per sq ft. Costs climb with 1950s systems, utility and agency fees, and tying new space into an existing home. Soft costs such as design, permits and surveys are additional. You receive a line-by-line budget before construction begins.
Does the Gateway rezoning apply?
It may. The County's Gateway rezoning, effective December 2023, changed zoning on 1,315 parcels in South Whittier-Sunshine Acres and West Whittier-Los Nietos, including corridor parcels, and added inclusionary housing requirements. We confirm your parcel's zone before design, and we check the County ADU ordinance separately.
Are you licensed and insured?
Yes. Heart Construction holds California Contractors State License Board license #1146456 and is bonded and insured for large-scale residential construction, major remodels and structural work. You can verify the license on the CSLB website.
Guides for South Whittier homeowners:
- ADU Cost Los Angeles
- Custom Home vs Remodel vs Rebuild in Los Angeles
- Cost to Build a Custom Home in Los Angeles (2026)
Nearby areas we serve: Walnut Park · South Gate · West Compton · Santa Fe Springs · West Whittier-Los Nietos · Pico Rivera
Region: All Southeast LA communities we serve · Everywhere we build