SOUTH SAN JOSE HILLS CUSTOM HOME BUILDER & GENERAL CONTRACTOR
Built With Intention. Flat Lots, Room To Grow.
SOUTH SAN JOSE HILLS HOMES ARE BUILT DIFFERENTLY
Heart Construction is a general contractor serving South San Jose Hills, specializing in custom homes, full renovations, and ADUs and additions for compact family lots. We work with homeowners, architects, engineers and designers through organized pre-construction, transparent budgeting and steady execution.
The County writes the rules here.
Your mailing address may say La Puente, West Covina or Valinda, but this community is unincorporated. Permits come from Los Angeles County Public Works, with Regional Planning zoning review first, and applications and inspections run through the County's online permit portal.
Lots are small, and County zoning counts garages, carports and covered patios toward lot coverage. ADUs need two approvals in sequence, and older homes may hide unpermitted work. Planning the order first protects your budget and your schedule.
We guide the process so every decision feels informed, not reactive, from the first call with a founder to the final walkthrough.
From ADUs and garage conversions to additions, full remodels, kitchens and baths near Sunshine Park, we bring the same structure and discipline we apply across the San Gabriel Valley and every project in Los Angeles.
RECENT PROJECTS
OUR REMODELING SERVICES
At Heart Construction, we specialize in creating thoughtfully designed homes that reflect the way you live. From custom ground-up builds to full-scale renovations and refined living spaces, we guide every project with craftsmanship, clarity and care for homeowners in Temple City, South San Gabriel, Valinda and beyond.
OUR CONSTRUCTION COMPANY SOUTH SAN JOSE HILLS PROCESS
PLAN
First a Strategic Visioning Session: A conversation about your goals, budget and timeline, and a frank read on what your site will allow. Complimentary.
TEAM
Second we assemble the architect, structural and geotechnical engineers, civil engineer, biologist and designers your project needs — matched to your style and site's constraints.
CALL
Third a Professional Services Agreement and a small retainer begin feasibility, permitting strategy, design coordination and line-by-line budgeting.
PERMITS
We assemble and file the complete CDP and building-permit package, coordinate Fire and Environmental Health reviews, and lock scope, finishes and schedule before groundbreaking.
CONSTRUCTION
Milestone-based build. Change orders are priced and approved in writing before work begins. You get a weekly update every week — progress, decisions needed, what's next.
CLOSEOUT
Finally Walkthrough with Final inspections, punch list, documentation and warranty handover. Payments are tied to completed milestones, never arbitrary percentages.
After you contact us, Within one business day, Asaf will call to understand your property and goals. If it's a fit, we schedule a site visit. There's no obligation and no pressure — just a clear picture of what's possible.
What to Know Before
You Build in South San Jose Hills
Two-agency County review sets the pace in South San Jose Hills. Regional Planning clears zoning first, then LA County Public Works handles plan check. Routine permits take 3–6 months; scopes that need Regional Planning clearances take 6–12 months. Construction of a custom home runs 10–16 months. The lever that most protects your schedule is a complete first submittal, which is why we assemble the full package before we file.
What It Costs
Costs here reflect small 1950s homes that often need structural and systems upgrades alongside the visible work, and compact lots mean every square foot of the plan has to earn its place. Custom homes typically run $500–$750+ per sq ft; whole-home renovations $325–$600+ per sq ft; detached ADUs $250,000–$450,000+; pools $120,000–$300,000+. Soft costs — design, surveys, structural engineering, permits — are additional. You receive a line-by-line budget before construction begins.
Permits & Local Rules
Permits come from Los Angeles County Public Works, and zoning follows the County zoning code, which counts garages, carports and covered patios toward lot coverage. ADUs get a Regional Planning site plan review first, then a Public Works building permit. Older unpermitted units can be legalized under a state pathway. We submit complete packages the first time and sequence these reviews from feasibility, so design decisions are made with the constraints known.
Where We Build in South San Jose Hills
We build in Covina Hills, La Seda and across the flat and gently rolling streets of South San Jose Hills. Covina Hills can bring more topography, which may mean added grading and engineering, while La Seda's flatter tract-style streets are typically simpler to access and design. Not sure which rules apply to your parcel? A feasibility review answers that in two to four weeks.
Meet the Builders Behind Your Project
Asaf Bar-Hen — Co-Founder & Developer Asaf leads design and development from concept to completion. His background spans 15 years in hospitality design, seven years in renewable energy and energy-efficient building, and real-estate work across the U.S., Asia and Central America. He leads every first call and brings a sustainability lens to each project, from energy-efficient design to fire-resilient construction.
Jason Aizenberg — Co-Founder Jason runs the operational side of every project — permits, design meetings, scheduling, subcontractor coordination and site logistics. Clients describe him as the person who "managed everything so we could focus on our family.”
California Contractors State License Board #1146456 — Class B General Building Contractor. Verify on CSLB ↗
25+ years of combined experience across high-end residential construction in Los Angeles
Frequently Asked Questions
About Renovation in South San Jose Hills
Who issues my permit here?
Los Angeles County Public Works – Building and Safety issues it, even if your mailing address says La Puente, West Covina or Valinda. Regional Planning reviews zoning first. We confirm County jurisdiction and any overlays during the feasibility review, before design begins, so you know the path on day one.
How long does an ADU take?
Permitting runs 3–6 months for routine work and 6–12 months when Regional Planning clearances are involved. The County's 60-day review clock starts only on a complete application, so a complete first submittal matters most. See our ADU construction timeline guide for each phase.
Cost to build a home here?
Custom homes typically run $500–$750+ per sq ft. Structural upgrades, systems work and finish level push a project toward the upper end. Soft costs — design, engineering and permits — are additional. You receive a line-by-line budget before construction begins.
Can I legalize my garage unit?
Often, yes. Assembly Bill 2533 requires the County to permit unpermitted ADUs and JADUs built before January 1, 2020, through direct submittal to Building and Safety. Expect proof of build date and a safety inspection. We assess the structure up front and scope any upgrades in your budget.
Are you licensed and insured?
Yes. Heart Construction holds California Contractors State License Board license #1146456 and is bonded and insured for large-scale residential construction, major remodels and structural work. You can verify the license on the CSLB website.
Guides for South San Jose Hills homeowners:
- ADU Cost Los Angeles
- Cost to Build a Custom Home in Los Angeles (2026)
- Second Story vs Home Addition in Los Angeles: What Actually Works
Nearby areas we serve: Temple City · South San Gabriel · Valinda · South Pasadena · Vincent · South El Monte
Region: All San Gabriel Valley communities we serve · Everywhere we build